Quick Steps To Raising The Soft Top
Refer to “Raising The Soft Top” in this section for further information.
1. Open the swing gate and raise the top, engaging the Sunrider latches (another person may be needed to help with this operation).


2. Engage header latches.

3. Install rear corner panels.

4. Install side and back windows.

See also:
Connectivity and Infotainment Features
The all-new 2011 Jeep Grand Cherokee will feature uconnect guardian as a
standard feature on all models (services provided by Hughes Telematics).
uconnect guardian provides customers with the top ...
Inside Day/Night Mirror
A two-point pivot system allows for horizontal and
vertical mirror adjustment. Adjust the mirror to center on
the view through the rear window.
Headlight glare can be reduced by moving the small ...
Programming A Rolling Code
For programming garage door openers that were manufactured
after 1995. These garage door openers can be
identified by the “LEARN” or “TRAIN” button located
where the hanging antenna is a ...


