Quick Steps To Raising The Soft Top

Refer to “Raising The Soft Top” in this section for further information.

1. Open the swing gate and raise the top, engaging the Sunrider latches (another person may be needed to help with this operation).

2. Engage header latches.

2. Engage header latches.

3. Install rear corner panels.

3. Install rear corner panels.

4. Install side and back windows.

4. Install side and back windows.

Lowering The Soft Top

    See also:

    Place/Retrieve a Call From Hold
    To put a call on hold, press the button until you hear a single beep. This indicates that the call is on hold. To bring the call back from hold, press and hold the button until you hear a singl ...

    Operating Instructions (Uconnect™ Phone) — If Equipped
    Refer to “Uconnect™ Phone” in the Uconnect™ User Manual located on the DVD for further details. ...

    Manual Heating And Air Conditioning
    Manual Temperature Control The Manual Temperature Controls consist of a series of outer rotary dials and inner push knobs. Blower Control Rotate this control to regulate the amount of air for ...