Quick Steps To Raising The Soft Top
Refer to “Raising The Soft Top” in this section for further information.
1. Open the swing gate and raise the top, engaging the Sunrider latches (another person may be needed to help with this operation).


2. Engage header latches.

3. Install rear corner panels.

4. Install side and back windows.

See also:
Front Axle Fluid Level Check
The front axle oil level needs to be between 1/8 in (3 mm)
below the bottom of the fill hole and the bottom of the fill
hole.
The front axle fill and drain plugs should be tightened to
22 to 29 ...
Preparations For Jacking
1. Park the vehicle on a firm, level surface. Avoid ice or
slippery surfaces.
WARNING!
Do not attempt to change a tire on the side of the
vehicle closest to moving traffic, pull far enough off ...
Power Inverter — If Equipped
There is a 115 Volt, 150Watt inverter outlet located on the
back of the center console to convert DC current to AC
current. This outlet can power cellular phones, electronics
and other low power ...


