Quick Steps To Raising The Soft Top
Refer to “Raising The Soft Top” in this section for further information.
1. Open the swing gate and raise the top, engaging the Sunrider latches (another person may be needed to help with this operation).


2. Engage header latches.

3. Install rear corner panels.

4. Install side and back windows.

See also:
Entering From The Side
Vehicles that move into your adjacent lanes from either
side of the vehicle.
Side Monitoring ...
Gross Trailer Weight (GTW)
The GTW is the weight of the trailer plus the weight of all cargo, consumables
and equipment (permanent or temporary) loaded in or on the trailer in its loaded
and ready for operation condition.
...
Automatic Temperature Control (ATC) — If Equipped
Automatic Temperature Control ...


