Quick Steps To Raising The Soft Top
Refer to “Raising The Soft Top” in this section for further information.
1. Open the swing gate and raise the top, engaging the Sunrider latches (another person may be needed to help with this operation).


2. Engage header latches.

3. Install rear corner panels.

4. Install side and back windows.

See also:
More than 45 Safety and Security Features
The all-new 2011 Jeep Grand Cherokee includes more than 45 safety and
security features.
Standard safety features include Electronic Stability Control (ESC),
Electronic Roll Mitigation (ERM), fo ...
Satellite Antenna
To ensure optimum reception, do not place items on the roof around the rooftop
antenna location. Metal objects placed within the line of sight of the antenna will
cause decreased performance. Larg ...
Traction Grades
The Traction grades, from highest to lowest, are AA, A, B,
and C. These grades represent the tire’s ability to stop on
wet pavement, as measured under controlled conditions
on specified govern ...


