Chassis

Maintenance Schedules

    See also:

    List Paired Mobile Phone Names
    • Press the button to begin. • After the “Ready” prompt and the following beep, say “Setup Phone Pairing”. • When prompted, say “List Phones”. • The Uconnect™ Phone will play ...

    Drain
    First remove the fill plug (B), then the drain plug (C). The recommended tightening torque for the drain and fill plugs is 15 to 25 ft lbs (20 to 34 N·m). CAUTION! When replacing the plugs, do no ...

    Entering From The Side
    Vehicles that move into your adjacent lanes from either side of the vehicle. Side Monitoring ...